August 25, 2017 – Buying materials

We spent much of the day at Lowe's buying the materials we need to install a floor over the deck plywood, and then to erect the prefabricated wall sections. We bought:


August 26, 2017 – Floor vinyl laid

Mike began nailing down 5mm plywood underlayment while Louise made a 65-mile round-trip to rent a 100-pound roller to flatten the vinyl floor covering after we lay it.

When Louise returned with the rented roller, we both set to work cutting and nailing the remaining underlayment. We used about 4½ sheets of plywood. We knocked off at 4:00 pm, with the floor ready for the sheet vinyl.

At 6:00 pm we returned to install the 12'x14' sheet vinyl floor covering. First we measured and cut a square hole for the pier opening, and a 3½" round hole for the 3-inch cable conduit near the computer location.

Later we installed the conduit, consisting of two sweep elbows, a straight length between them, and a short up-pipe at each end. This photo shows the conduit at the computer end.

With the holes cut and the vinyl accurately positioned, Louise folded back a section, and Mike troweled adhesive onto the plywood underlayment. This was tedious and time-consuming, but all went well. Finally, we rolled the heavy roller over the entire floor to remove any bubbles under the vinyl, and press it firmly onto the adhesive for a good bond. We covered the floor with a tarp, and finished today's work around 9:00 pm.


August 27, 2017 – Floor complete

This morning we trimmed off the excess vinyl around the deck, and inside the square pier hole. Here's the result.